New Industry Products

DIN Rail Power Supplies with up to 94.5% Efficiency

April 04, 2017 by Jeff Shepard

Traco Power has announced the release of their TIB Family of DIN Rail Mount Power supplies that feature efficiencies up to 94.5%. This new generation of DIN-rail power supplies combines the most efficient circuit topology with optimized cost/performance ratio for industrial environments and control cabinets.

These products are the new vanguard of industrial DIN-Rail power supplies by substantially reducing power losses. Their high efficiency enables a slimmer package design with a DIN Rail clip that can be mounted on either the rear (typical installations) or side (flat panel installations) of the power supply with DC-OK LED indicators on both the front and side panels.

The product’s reduced heat dissipation enables a -20 to +60 degrees C full load operating temperature range and up to 70 degrees C with only 20% de-rating. The supplies offer 150% boost power for a minimum of 4 seconds to support stepper motors, solenoids or actuators with true power-back immunity (no voltage over / under shoot). EMC immunity is compliant for applications in industrial environments (EN 61000-6-2) with emissions compliant with the standard for residential and commercial environments (EN 61000-6-3).

The outputs are radio-interference-suppressed to impede radiation at long output lines. This filter reduces the common mode current to within limits of telecommunication ports. The units operate with a high power factor of up to 99% with active power factor correction which also minimizes input inrush current.

The TIB Family is available in four power ranges of 80-, 120-, 240- or 480-Watts with 24Vdc outputs (adjustable from 23.5- to 28-Vdc). All models are safety approved to meet UL/EN60950-1 and UL508 listed with compliance to EN61000-6-2 and EN61000-6-3 EMC Standards. The reliability of these power supplies is supported by Traco’s 3 year product warranty.

Products are in stock and available through distributors around the globe with manufacturing lead times of 8 weeks.